Default Realistic Delivery Times

Hi all, I just placed an order of a Carpathian 110 back in mid July.....dealer is not giving to much info on a lead-time......what's a realist delivery expectation?
Thanks
 
  #2  
Old 09-12-2022, 04:13 PM
jusmax88's Avatar
Mudding
Join Date: Jun 2022
Location: Brooklyn, NY
Posts: 215
Received 130 Likes on 73 Posts
Default

Originally Posted by def110fla
Hi all, I just placed an order of a Carpathian 110 back in mid July.....dealer is not giving to much info on a lead-time......what's a realist delivery expectation?
Thanks
I placed an order for a P300S 90 first week of July and I’m being told it’s being built this month with delivery expected in December. If I get it by the end of January I’ll be happy
 
  #3  
Old 09-12-2022, 04:18 PM
Jespey's Avatar
Drifting
Join Date: Nov 2021
Location: St Augustine FL
Posts: 34
Received 9 Likes on 7 Posts
Default

Ours took five months from the day LR accepted the order to the day we picked it up from the dealer in Jacksonville Fl. It took about two months from the day we were notified it was built. There are lots of variables. The dealer never knew very much other than the major milestones like order acceptance, build, shipping date. Even though they eventually knew the scheduled date for the ship to arrive in Brunswick, they were as surprised as I was to receive the Defender two days later.
 
  #4  
Old 09-12-2022, 06:34 PM
MattF's Avatar
Winching
Join Date: Feb 2022
Posts: 655
Received 592 Likes on 306 Posts
Default

Originally Posted by def110fla
Hi all, I just placed an order of a Carpathian 110 back in mid July.....dealer is not giving to much info on a lead-time......what's a realist delivery expectation?
Thanks
It depends - it's possible to place an order with a dealer but if the dealer doesn't have an allocation for a truck then the order won't be placed with JLR. It might help to ask your dealer if the order has been placed with JLR. If is has he should be able to provide a "build sheet" with your spec and tentative dates for the following: Last change allowed, build date, delivery date, customer handover date. Grated in my case everything went to plan but once the truck was built there were delays of two months. 7 months from allocation to delivery (last Saturday!!!!)
 
  #5  
Old 09-13-2022, 01:20 AM
n4v4nod's Avatar
Three Wheeling
Join Date: Aug 2021
Posts: 96
Received 52 Likes on 21 Posts
Default

Like mentioned... there are lot of variables. I placed a deposit for our 110X August 2021, built late May 2022, arrived stateside 3rd of September... waiting for port installed parts now (some options some standard).
 
  #6  
Old 09-13-2022, 06:17 AM
PaulLR's Avatar
Recovery Vehicle
Join Date: May 2017
Location: Boston, MA
Posts: 966
Received 681 Likes on 409 Posts
Default

Originally Posted by MattF
It depends - it's possible to place an order with a dealer but if the dealer doesn't have an allocation for a truck then the order won't be placed with JLR. It might help to ask your dealer if the order has been placed with JLR. If is has he should be able to provide a "build sheet" with your spec and tentative dates for the following: Last change allowed, build date, delivery date, customer handover date. Grated in my case everything went to plan but once the truck was built there were delays of two months. 7 months from allocation to delivery (last Saturday!!!!)
^This. The LR dealer closest to me told me 9-12 months for a Defender since they are just stacking up the orders in a folder waiting for allocated build spots. Another dealer an hour away had a build spot I could modify and I went and did that yesterday. Looking forward to driving a Defender again since my wife took mine and I've been stuck driving our X5.
 
  #7  
Old 09-13-2022, 07:36 AM
def110fla's Avatar
4th Gear
Thread Starter
Join Date: Aug 2022
Posts: 4
Likes: 0
Received 0 Likes on 0 Posts
Default

The dealer just indicated they have 60 Defenders in the queue and are currently receiving around 10/ month....hopefully we'll receive the last change request soon.
 
  #8  
Old 09-14-2022, 12:48 PM
Santini's Avatar
Overlanding
Join Date: Sep 2022
Posts: 24
Received 21 Likes on 10 Posts
Default

Ordered 110X 1/18, built 6/13, will finally hit port in Baltimore 9/17. Hopefully not held in port too long but needs roof rack ladder and lunch box. Crazy wait time.
 
  #9  
Old 09-14-2022, 01:01 PM
def110fla's Avatar
4th Gear
Thread Starter
Join Date: Aug 2022
Posts: 4
Likes: 0
Received 0 Likes on 0 Posts
Default

JLR is currently indicating 9-12 months....hoping my Carpathian order...…essentially a fully optioned vehicle is not impacted to badly with chip supply issues
 
  #10  
Old 09-14-2022, 01:21 PM
Trekkie's Avatar
Rock Crawling
Join Date: Jun 2022
Location: Wake Forest, NC
Posts: 274
Received 246 Likes on 131 Posts
Default

I looked at one on June 11th. Built the config and gave it to the dealer on the 13th. They got some allocation later that month and my last change date was June 29th.

Currently expectation is first week of October for it to get here. This is a 2023.5 110 SE model with a bunch of options.
 
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Moretti
2020 Defender
319
10-10-2022 08:02 PM
def110fla
2020 Defender
0
09-12-2022 03:18 PM
hl6
2020 Defender
3
02-16-2022 11:39 AM



Quick Reply: Realistic Delivery Times



All times are GMT -5. The time now is 07:45 PM.