Getting g ready to say goodbye
#1
Getting ready to say goodbye
Very reluctantly getting to where I have to admit I’m done with my D2.
I thought I’d post her here first if anyone around Toronto is interested.
Lots still good about her. SE, 200k, Centre locking with a d1 arm mod, original transfer case, option 2 done and everything else on the site that I’ve been helped so generously with.
Great rubber, both summer and winter. Both sets on rims.
A couple of holes on the bottom of the frame that I’m convinced a good welder could deal with, ac needs it’s radiator replaced (I have the part), passenger ball joints need doing (also have the part). Mechanic says the transmission lines need doing (but seem fine to me).
With much thanks to this great forum.
N.
I thought I’d post her here first if anyone around Toronto is interested.
Lots still good about her. SE, 200k, Centre locking with a d1 arm mod, original transfer case, option 2 done and everything else on the site that I’ve been helped so generously with.
Great rubber, both summer and winter. Both sets on rims.
A couple of holes on the bottom of the frame that I’m convinced a good welder could deal with, ac needs it’s radiator replaced (I have the part), passenger ball joints need doing (also have the part). Mechanic says the transmission lines need doing (but seem fine to me).
With much thanks to this great forum.
N.
Last edited by Fallstaff; 11-05-2022 at 04:59 PM.
#2
The following users liked this post:
Richard Gallant (11-06-2022)
#3
Thread
Thread Starter
Forum
Replies
Last Post