Build Threads Create a build thread to compile pictures and descriptions of your LR build.

Super Model With Bad Crack Habit Rehab Build-

Old Feb 18, 2016 | 08:23 PM
  #351  
TOM R's Avatar
Baja
Joined: Mar 2009
Posts: 5,736
Likes: 230
From: south n.j. and ne va.
Default

If you want aluminum skid best price I found was a place in Texas , works well
 
Reply
Old Feb 24, 2016 | 05:51 PM
  #352  
Detoured Discovey's Avatar
Thread Starter
|
Recovery Vehicle
Joined: Apr 2015
Posts: 951
Likes: 39
From: AWESOMEVILLE, MAINE
Default

So, while I need to address the skid still......I've had multiple objectives taking up space in the shop.....and since steel and wood don't mix well, need to loooooooooose the wood!!!!


Rear door panel DONE and out of my way!


Name:  DSCF4732_zpsngb0pgvb.jpg
Views: 146
Size:  399.0 KB


Not the greatest pic......but time to move on.......Done, out of the way, incorporated another 12volt power source, switch activated....all and all, cheap and nice.......I might incorporate some vertical wear strips to keep it clean down the road....but over all, very happy it's DONE!!!!!


Name:  DSCF4733_zpsu87v9ze5.jpg
Views: 147
Size:  194.7 KB
 
Reply
Old Feb 24, 2016 | 05:57 PM
  #353  
MrValingo's Avatar
Rock Crawling
Joined: Mar 2015
Posts: 284
Likes: 53
From: Madison, wi
Default

Not too shabby. I need to do something with my rear door. I still have a hole were the factory subs were
 
Reply
Old Feb 24, 2016 | 06:38 PM
  #354  
Detoured Discovey's Avatar
Thread Starter
|
Recovery Vehicle
Joined: Apr 2015
Posts: 951
Likes: 39
From: AWESOMEVILLE, MAINE
Default

My system was chopped.........unknowingly....which smoked the system......I may have 2 Pyle subs available, new & cheap.......guess I thought I could upgrade the burned out stuff......but most of it fried.
Rewiring the entire system without subs......looking more at expanding space on my end.
 
Reply
Old Mar 3, 2016 | 05:52 PM
  #355  
Detoured Discovey's Avatar
Thread Starter
|
Recovery Vehicle
Joined: Apr 2015
Posts: 951
Likes: 39
From: AWESOMEVILLE, MAINE
Default

Well.....Gas tank retention/skittish skid is now complete......I didn't have a whole bunch to work with.....but the ends were still there..lol..


Found myself having to build it in sections, but that's okay, I beveled the back side and made it happen......found some 3/16" D Plate off in the corner I forgot about....about an hour and 45 later.....it was done. Finished pic's tomorrow once everything dries.....




 
Reply
Old Mar 4, 2016 | 01:06 AM
  #356  
MrValingo's Avatar
Rock Crawling
Joined: Mar 2015
Posts: 284
Likes: 53
From: Madison, wi
Default

I need to learn how to weld.
 
Reply
Old Mar 4, 2016 | 08:40 AM
  #357  
Detoured Discovey's Avatar
Thread Starter
|
Recovery Vehicle
Joined: Apr 2015
Posts: 951
Likes: 39
From: AWESOMEVILLE, MAINE
Default

All righty......With the bed liner cured over night, time to move on......




Reinstall went real well, no issues....removed the rear sway bar while I was under there....don't think it was worth much any way due to the worn out bushings....




Not being able to leave well enough alone last night, I simply couldn't leave all that bare steel alone........so, in case I ever get to break a crest with Doug as my spotter, I figured I'd give him something to snicker about.......




lol......I give you, Mud Flap Girl....




That's it!
On to the next issue!!
 
Reply
Old Mar 5, 2016 | 01:11 AM
  #358  
ihscouts's Avatar
Camel Trophy
Joined: Jan 2010
Posts: 4,245
Likes: 402
From: Traverse City MI
Default

Pictures of my sister eh!
 
Reply
Old Mar 5, 2016 | 01:38 AM
  #359  
ihscouts's Avatar
Camel Trophy
Joined: Jan 2010
Posts: 4,245
Likes: 402
From: Traverse City MI
Default

I was just asked/told that I get a 20 hour class in food grade TIG'n starting April 4 to get my cert. All overtime fun games, I bring the donuts...... now if I can get my ammonia refrigeration and boiler certs paid for I'll be a very wealthy fella...... I feel a Range Rover in my near future........
 
Reply
Old Mar 5, 2016 | 07:36 AM
  #360  
drowssap's Avatar
Baja
Joined: Feb 2011
Posts: 9,298
Likes: 318
From: Boston Strong
Default

Very nice

Originally Posted by ihscouts
I was just asked/told that I get a 20 hour class in food grade TIG'n starting April 4 to get my cert. All overtime fun games, I bring the donuts...... now if I can get my ammonia refrigeration and boiler certs paid for I'll be a very wealthy fella...... I feel a Range Rover in my near future........
 
Reply

Thread Tools
Search this Thread

All times are GMT -5. The time now is 11:11 AM.